Contractor Sign-off that Materials are Understood
In section 4.3 the separation requirement for yellow CSST only applies to vertical runs of Gastite.
True
False
Gastite yellow CSST shall not be installed within a chase or enclosure that includes a metallic appliance vent and/or metallic chimney liner that protrudes through and or past the roof.
True
False
Gastite yellow shall not contact reflective radiant barrier insulation that is attached to the underside of a roof deck or attic walls.
True
False
Gastite requires that all gas piping systems containing a section of yellow Gastite CSST be directly bonded to the existing grounding system of the structure.
True
False
A copy of the Current Gastite Design and Installation Guide can be found in which location.
On www.Gastite.com
On the Gastite App
By calling Gastite customer service
All of the above
The stripping tool is used to achieve the necessary end preparation of the FlashShield CSST.
True
False
Slide 16 of 16